{"meta": {"name": "Standby Atlas free index", "data_as_of": "2026-11-09", "records": 172, "fields": ["id", "country", "municipality", "operator", "stage", "filing_date", "it_mw", "grid_mw", "backup_generators", "thermal_mw", "engine_makes", "source_authority", "source_url"], "licence": "Free fields, reuse with attribution: Standby Atlas, standbyatlas.com", "full_fields": "Backup Fleet, Team and Intelligence licences, https://standbyatlas.com/pricing/"}, "projects": [{"id": "DE-HE-HEUSENSTAMM-EDGECONNEX-FRA11-12", "country": "Germany", "municipality": "Heusenstamm", "operator": "EdgeConneX Heusenstamm GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-02-16", "it_mw": null, "grid_mw": null, "backup_generators": 42, "thermal_mw": 305.0, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-06/26_02_16_genehmigungsbescheid_rz_heusenstamm_edgeconnex.pdf"}, {"id": "DE-HE-DIETZENBACH-REDTEC-DC1A", "country": "Germany", "municipality": "Dietzenbach", "operator": "Redtec Computing GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-06-29", "it_mw": null, "grid_mw": null, "backup_generators": 38, "thermal_mw": 230.0, "engine_makes": "MTU", "source_authority": "UVP-Portal", "source_url": "https://www.uvp-verbund.de/documents-ige-ng/igc_he/b066d6cb-374e-46fd-9645-ba6f080b60fb/Ver%C3%B6ffentlichungstext%20Bescheid%20Homepage.pdf"}, {"id": "DE-HE-RAUNHEIM-VDC-FRA31", "country": "Germany", "municipality": "Raunheim", "operator": "VDC FRA31 GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-06-17", "it_mw": null, "grid_mw": null, "backup_generators": 22, "thermal_mw": 134.94, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-06/zoeb_oeb_rz_raunheim_fra31_2026_08_13.pdf"}, {"id": "DE-HE-HOFHEIM-DCH-MARXHEIM", "country": "Germany", "municipality": "Hofheim am Taunus (Marxheim)", "operator": "DCH GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-08-19", "it_mw": null, "grid_mw": null, "backup_generators": 14, "thermal_mw": 100.8, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-08/zoeb_dch-gen_2026-09-21_end.pdf"}, {"id": "DE-HE-HANAU-CYRUSONE-FF5", "country": "Germany", "municipality": "Hanau", "operator": "CyrusOne Frankfurt 5 Holdings B.V.", "stage": "Permit amendment filed (BImSchG)", "filing_date": "2026-06-16", "it_mw": null, "grid_mw": null, "backup_generators": 43, "thermal_mw": 244.0, "engine_makes": "Cummins", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-07/aenderungsgenehmigungsbescheid_ndma_ff5_1_hanau_fb_mit_anlagen.pdf"}, {"id": "DE-HE-SCHWALBACH-TAGO", "country": "Germany", "municipality": "Schwalbach am Taunus", "operator": "TAGO Schwalbach GmbH & Co. KG", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-09-26", "it_mw": null, "grid_mw": null, "backup_generators": 12, "thermal_mw": 95.28, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2025-10/zoeb_tago-10-8-bimschg_2025-12-03_end.pdf"}, {"id": "DE-BE-BERLIN-NTT-BER2-C2", "country": "Germany", "municipality": "Berlin", "operator": "NTT Global Data Centers BER 2 GmbH", "stage": "Permit amendment filed (BImSchG)", "filing_date": "2026-04-20", "it_mw": null, "grid_mw": null, "backup_generators": 24, "thermal_mw": 300.32, "engine_makes": "", "source_authority": "Senate of Berlin", "source_url": "https://www.berlin.de/sen/uvk/_assets/umwelt/bekanntmachungen/20260417_bek_ic210-14054.pdf"}, {"id": "DE-BB-WUSTERMARK-VIRTUS-M5", "country": "Germany", "municipality": "Wustermark", "operator": "Virtus Wustermark 1 GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-12-10", "it_mw": null, "grid_mw": null, "backup_generators": 17, "thermal_mw": 121.0, "engine_makes": "", "source_authority": "bravors.brandenburg.de", "source_url": "https://bravors.brandenburg.de/fm/76/Amtsblatt%2050_25.pdf"}, {"id": "DE-HE-FRANKFURT-CYRUSONE-FF7", "country": "Germany", "municipality": "Frankfurt am Main (Griesheim)", "operator": "CyrusOne Frankfurt 7 Holdings B.V.", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-06-17", "it_mw": null, "grid_mw": null, "backup_generators": 43, "thermal_mw": 255.3, "engine_makes": "MTU; Cummins", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-07/bescheid-4_ndma-ff7-cyrusone_end.pdf"}, {"id": "DE-HE-HANAU-DATA4-CAMPUS", "country": "Germany", "municipality": "Hanau (Großauheim)", "operator": "Data 4 Germany S.à r.l.", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-07-07", "it_mw": null, "grid_mw": null, "backup_generators": 65, "thermal_mw": 457.0, "engine_makes": "", "source_authority": "Gemeinde Großkrotzenburg", "source_url": "https://www.grosskrotzenburg.de/rathaus-politik/aktuelles/amtliche-bekanntmachungen/2026/07/notstromdieselmotoranlage/26-06-30-veroeffentlichung-bescheid-homepagerp-data-4-1.-tg-kep.pdf?cid=c5k"}, {"id": "DE-HE-LIEDERBACH-A100ROW", "country": "Germany", "municipality": "Liederbach am Taunus", "operator": "A100 ROW GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-08-26", "it_mw": null, "grid_mw": null, "backup_generators": 50, "thermal_mw": 360.08, "engine_makes": "Caterpillar", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-08/zoeb_a100row-gen_2026-09-22_end.pdf"}, {"id": "DE-HE-FRANKFURT-EQUINIX-FR8-FR15", "country": "Germany", "municipality": "Frankfurt am Main (Griesheim)", "operator": "Equinix (Germany) GmbH", "stage": "Permit amendment filed (BImSchG)", "filing_date": "2026-08-10", "it_mw": null, "grid_mw": null, "backup_generators": 40, "thermal_mw": 274.0, "engine_makes": "", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-08/oeffentliche_bekanntmachung_hp.pdf"}, {"id": "DE-HE-FRANKFURT-FRA03", "country": "Germany", "municipality": "Frankfurt am Main (Schwanheim)", "operator": "Esfandyar Ventures One SARL", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-09-10", "it_mw": null, "grid_mw": null, "backup_generators": 60, "thermal_mw": 392.0, "engine_makes": "MTU; Caterpillar; Kohler (Rehlko)", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2025-09/2025-09-10_genehmigungsbescheid_fra03_final_mit_unterschrift_scan.pdf"}, {"id": "FR-IDF-AULNAY-DATAHILLS", "country": "France", "municipality": "Aulnay-sous-Bois", "operator": "SNC Data Hills", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-02-12", "it_mw": 240.0, "grid_mw": null, "backup_generators": 114, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2025-02-12-aulnay-sous-bois_centre_de_donnees_data_hills_avis_adopte_-__1_.pdf"}, {"id": "FR-PACA-PENNES-TELEHOUSE-CEZANNE", "country": "France", "municipality": "Les Pennes-Mirabeau", "operator": "TELEHOUSE International Corporation of Europe Ltd", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-10-09", "it_mw": null, "grid_mw": null, "backup_generators": 36, "thermal_mw": 289.0, "engine_makes": "", "source_authority": "Public consultation register (France)", "source_url": "https://www.registre-dematerialise.fr/6580/download/component/117434/avis-de-la-mrae-pennes-mirabeau-13-p-icpe-datacenter"}, {"id": "FR-ARA-BLYES-PIPA-DC1", "country": "France", "municipality": "Blyes", "operator": "SAS PIPA-DC1", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2026-08-13", "it_mw": 130.0, "grid_mw": 195.0, "backup_generators": 74, "thermal_mw": 547.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/avis-20260730-ap-2098-n022432-datacenter-blyes-01.pdf"}, {"id": "FR-ARA-SAINTPRIEST-PENTA", "country": "France", "municipality": "Saint-Priest", "operator": "Penta Lyon", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2026-06-11", "it_mw": null, "grid_mw": 23.0, "backup_generators": 12, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/20260611_apara2064-n16668_icpe_datacenter_saintpriest_69_delibere.pdf"}, {"id": "FR-HDF-GRAVELINES-OVHCLOUD", "country": "France", "municipality": "Gravelines", "operator": "OVHcloud", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-10-28", "it_mw": null, "grid_mw": null, "backup_generators": 69, "thermal_mw": 185.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/005469_ap__actualisation7183_datacenter_ovh_gravelines.pdf"}, {"id": "FR-HDF-RANTIGNY-CAMPUS", "country": "France", "municipality": "Rantigny", "operator": "", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2026-07-16", "it_mw": 480.0, "grid_mw": 300.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/cr_16-07-26.pdf"}, {"id": "FR-GE-PETITLANDAU-MICROSOFT", "country": "France", "municipality": "Petit-Landau / Hombourg", "operator": "Microsoft 1985 Sàrl", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2026-06-22", "it_mw": null, "grid_mw": null, "backup_generators": 111, "thermal_mw": null, "engine_makes": "", "source_authority": "Mulhouse Alsace Agglomération", "source_url": "https://www.m2a.fr/wp-content/uploads/2026/06/2026_06_22_99_DE-2026-161C.pdf"}, {"id": "FR-IDF-RUNGIS-ICADE", "country": "France", "municipality": "Rungis", "operator": "Icade", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-05-07", "it_mw": 84.0, "grid_mw": 130.0, "backup_generators": 59, "thermal_mw": 505.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2025-05-07_rungis_94_projet_de_datacenter_dicade_delibere.pdf"}, {"id": "FR-IDF-CORBEIL-DATAVILLAGE", "country": "France", "municipality": "Corbeil-Essonnes / Le Coudray-Montceaux", "operator": "LCP FR DC1", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-05-07", "it_mw": null, "grid_mw": null, "backup_generators": 62, "thermal_mw": 527.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2025-05-07_corbeil-essonnes_91_data_center_village_delibere_.pdf"}, {"id": "FR-IDF-SAINTOUEN-OPCORE-DC5", "country": "France", "municipality": "Saint-Ouen-l'Aumône", "operator": "OPCORE", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2026-01-21", "it_mw": null, "grid_mw": null, "backup_generators": 27, "thermal_mw": 71.92, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2026-01-21_st-ouen-l_aumone_extension_datacenterdc5_delegue.pdf"}, {"id": "FR-IDF-MEUDON-EQUINIX-PA15", "country": "France", "municipality": "Meudon", "operator": "Equinix Hyperscale 2 (PA15) SAS", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-11-19", "it_mw": null, "grid_mw": 80.0, "backup_generators": 33, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/19-11-2025_meudon-_centre_de_donnees_delibere.pdf"}, {"id": "IE-DUB-LUCAN-EDGECONNEX-DUB06", "country": "Ireland", "municipality": "Lucan (Ballymakaily)", "operator": "EdgeConneX Ireland Limited", "stage": "Planning permission granted on appeal", "filing_date": "2025-07-31", "it_mw": null, "grid_mw": null, "backup_generators": 24, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/orders/317/d317802.pdf"}, {"id": "IE-DUB-CLONDALKIN-MICROSOFT-DUB14-15", "country": "Ireland", "municipality": "Clondalkin (Grange Castle Business Park)", "operator": "Microsoft Operations Ireland Ltd.", "stage": "Permit extended", "filing_date": "2026-07-21", "it_mw": null, "grid_mw": null, "backup_generators": 21, "thermal_mw": null, "engine_makes": "", "source_authority": "South Dublin County Council", "source_url": "https://planning.southdublin.ie/Home/ViewWeeklyListDocument/3927"}, {"id": "IE-KE-LEIXLIP-AMAZON-KIC-B1", "country": "Ireland", "municipality": "Leixlip", "operator": "Amazon Data Services Ireland Limited", "stage": "Refused or not admitted", "filing_date": "2025-10-17", "it_mw": null, "grid_mw": null, "backup_generators": 15, "thermal_mw": 111.9, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b28095e27e.pdf"}, {"id": "IE-KE-NAAS-HERBATA", "country": "Ireland", "municipality": "Naas", "operator": "Herbata Limited", "stage": "Planning permission granted on appeal", "filing_date": "2025-08-20", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Kildare County Council", "source_url": "https://kildarecoco.ie/AllServices/Planning/PlanningApplicationsandPermission/DecisionsonPlanningApplicationswithEIAR/Decisions%20on%20planning%20applications%20accompanied%20by%20an%20Environmental%20Impact%20Assessment%20Report%20(EIAR).pdf"}, {"id": "IE-DUB-CRUISERATH-UNIVERSAL-EFG", "country": "Ireland", "municipality": "Dublin 15 (Cruiserath)", "operator": "Universal Developers LLC", "stage": "Planning permission granted on appeal", "filing_date": "2025-12-19", "it_mw": null, "grid_mw": null, "backup_generators": 39, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/orders/318/d318180.pdf"}, {"id": "IE-DUB-BALDONNELL-GOOGLE", "country": "Ireland", "municipality": "Baldonnell (Grange Castle Business Park South / Profile Park)", "operator": "Google Ireland Limited", "stage": "Planning permission granted on appeal", "filing_date": "2026-09-23", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/en-ie/case/320852"}, {"id": "NL-NH-MIDDENMEER-MICROSOFT-AMSE-B1", "country": "Netherlands", "municipality": "Middenmeer (Agriport)", "operator": "Microsoft Datacenters Netherlands B.V.", "stage": "EIA scoping notice", "filing_date": "2025-12-30", "it_mw": null, "grid_mw": null, "backup_generators": 126, "thermal_mw": null, "engine_makes": "", "source_authority": "Officiële bekendmakingen", "source_url": "https://zoek.officielebekendmakingen.nl/prb-2025-21956.pdf"}, {"id": "NL-NH-AMSTERDAM-EQUINIX-AM6", "country": "Netherlands", "municipality": "Amsterdam", "operator": "Equinix (Netherlands) B.V.", "stage": "Environmental permit application", "filing_date": "2026-04-20", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Officiële bekendmakingen", "source_url": "https://zoek.officielebekendmakingen.nl/prb-2026-6693.pdf"}, {"id": "NO-NORDLAND-NARVIK-AKER-NSCALE", "country": "Norway", "municipality": "Narvik (Bjerkvik)", "operator": "Aker Nscale AS (client unique)", "stage": "Grid concession granted", "filing_date": "2026-03-11", "it_mw": null, "grid_mw": 250.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/ef898a5b-14a7-4d5e-8dfa-51fc72100e4a/202503343/3450303"}, {"id": "NO-AGDER-SIRDAL-TONSTAD", "country": "Norway", "municipality": "Sirdal (Tonstad)", "operator": "Tonstad Datapark AS", "stage": "Grid concession granted", "filing_date": "2025-12-10", "it_mw": null, "grid_mw": 300.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/dc9be507-8aea-400a-9c3a-f6bad0d15006/202519658/3449201"}, {"id": "NO-TELEMARK-SKIEN-WSCOMPUTING", "country": "Norway", "municipality": "Skien (Gromstul)", "operator": "WS Computing AS", "stage": "Grid concession granted", "filing_date": "2026-01-28", "it_mw": null, "grid_mw": 240.0, "backup_generators": 46, "thermal_mw": 338.1, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/0dd0ccd8-8a20-413e-bd03-bedc078ac3b8/202524612/3449545"}, {"id": "SE-VN-SOLLEFTEA-ATNORTH-SWE04", "country": "Sweden", "municipality": "Sollefteå (Långsele)", "operator": "atNorth AB", "stage": "Pre-application consultation", "filing_date": "2026-06-16", "it_mw": null, "grid_mw": null, "backup_generators": 145, "thermal_mw": 1200.0, "engine_makes": "", "source_authority": "Consultation file published by the operator", "source_url": "https://www.atnorth.com/wp-content/uploads/2026/06/SWE04-Samradsunderlag-260616.pdf"}, {"id": "ES-MD-VILLALBILLA-IGNIS-BETAII", "country": "Spain", "municipality": "Villalbilla", "operator": "Ignis Data Alfa, S.L.", "stage": "Public notice: prior and construction authorisation", "filing_date": "2026-02-06", "it_mw": null, "grid_mw": 181.62, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Boletín Oficial del Estado", "source_url": "https://www.boe.es/boe/dias/2026/02/06/pdfs/BOE-B-2026-3291.pdf"}, {"id": "ES-EX-BADAJOZ-NOSTRUM-EVERGREEN", "country": "Spain", "municipality": "Badajoz", "operator": "Data Riocaya, S.L.U.", "stage": "Public notice: prior and construction authorisation", "filing_date": "2026-09-15", "it_mw": null, "grid_mw": 300.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Boletín Oficial del Estado", "source_url": "https://boe.es/boe/dias/2026/09/15/pdfs/BOE-B-2026-29930.pdf"}, {"id": "IT-LAZIO-ROMA-ARUBA-TIBURTINO", "country": "Italy", "municipality": "Rome (Tecnopolo Tiburtino)", "operator": "Aruba S.p.A.", "stage": "EIA screening", "filing_date": "2024-10-03", "it_mw": null, "grid_mw": null, "backup_generators": 51, "thermal_mw": 146.11, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/1163196"}, {"id": "CH-SH-BERINGEN-DC2", "country": "Switzerland", "municipality": "Beringen", "operator": "", "stage": "Building permit application", "filing_date": "2026-09-01", "it_mw": null, "grid_mw": 40.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Canton of Schaffhausen", "source_url": "https://sh.ch/CMS/get/file/46b69d80-0ec9-4ff7-8e9d-052fced83482"}, {"id": "DE-HE-FRANKFURT-EQUINIX-FR10X", "country": "Germany", "municipality": "Frankfurt am Main (Seckbach)", "operator": "Equinix Hyperscale 2 (FR10) GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-06-05", "it_mw": null, "grid_mw": null, "backup_generators": 11, "thermal_mw": 76.0, "engine_makes": "", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-06/oeb_genehmigungsbescheid_equinix-hyperscale-2-fr10-gmbh.pdf"}, {"id": "DE-HE-FRANKFURT-EQUINIX-FR16X", "country": "Germany", "municipality": "Frankfurt am Main (Seckbach)", "operator": "Equinix Hyperscale 2 (FR16) GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-04-17", "it_mw": null, "grid_mw": null, "backup_generators": 11, "thermal_mw": 76.01, "engine_makes": "Cummins", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-07/bescheid_gen-2022-001_equ-ndma-fr16x_endfassung.pdf"}, {"id": "DE-HE-BADVILBEL-VILDCCAMPUS", "country": "Germany", "municipality": "Bad Vilbel (Massenheim)", "operator": "VIL DC Campus GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2024-12-10", "it_mw": null, "grid_mw": null, "backup_generators": 13, "thermal_mw": 94.0, "engine_makes": "", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-12/oeffentliche_bekanntmachung_vil_dc_campus_gmbh.pdf"}, {"id": "DE-HE-FRANKFURT-COLT-FRA3", "country": "Germany", "municipality": "Frankfurt am Main (Sossenheim)", "operator": "Horizon Data Center Frankfurt LLC", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-08-08", "it_mw": null, "grid_mw": null, "backup_generators": 24, "thermal_mw": 170.0, "engine_makes": "MTU; Caterpillar; Kohler (Rehlko)", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-10/genehmigungsbescheid_colt_fra3.pdf"}, {"id": "DE-HE-NEUISENBURG-GOODMAN-FRA2", "country": "Germany", "municipality": "Neu-Isenburg", "operator": "Goodman Alana Logistics (Lux) S.à r.l.", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-12-15", "it_mw": null, "grid_mw": null, "backup_generators": 40, "thermal_mw": 292.0, "engine_makes": "Caterpillar", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2025-12/oeb_goodman_alana_logistics_entscheidung_homepage.pdf"}, {"id": "DE-HE-FRANKFURT-MWH01-2", "country": "Germany", "municipality": "Frankfurt am Main (Seckbach)", "operator": "MWH01 GmbH & Co. KG", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-03-18", "it_mw": null, "grid_mw": null, "backup_generators": 8, "thermal_mw": 53.1, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2025-03/veroeffentlichung_bescheid_homepagerp_mwh01.2.pdf"}, {"id": "DE-HE-FRANKFURT-MWH01-1", "country": "Germany", "municipality": "Frankfurt am Main (Seckbach)", "operator": "MWH01 GmbH & Co. KG", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-02-02", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen"}, {"id": "DE-HE-RAUNHEIM-VANTAGE-FRA32", "country": "Germany", "municipality": "Raunheim", "operator": "VDC FRA32 GmbH (Vantage Data Centers FRA32 GmbH)", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2026-03-23", "it_mw": null, "grid_mw": null, "backup_generators": 20, "thermal_mw": 154.0, "engine_makes": "", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen"}, {"id": "DE-HE-OFFENBACH-VDC-FRA12", "country": "Germany", "municipality": "Offenbach am Main", "operator": "VDC FRA 12 GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2025-09-08", "it_mw": null, "grid_mw": null, "backup_generators": 12, "thermal_mw": 81.12, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2025-09/08_bekanntmachung_entscheidung_rpda_entwurf_250904.pdf"}, {"id": "DE-HE-DIETZENBACH-EDGECONNEX-FRA01", "country": "Germany", "municipality": "Dietzenbach", "operator": "EdgeConneX Dietzenbach GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-05-23", "it_mw": null, "grid_mw": null, "backup_generators": 42, "thermal_mw": 246.8, "engine_makes": "MTU", "source_authority": "UVP-Portal", "source_url": "https://uvp-verbund.de/documents-ige-ng/igc_he/15e0a370-6bd5-4c8d-a13d-6048d2720838/Ver%C3%B6ffentlichungtext%20Bescheid%20Homepage%20RZ%20Dietzenbach%20EdgeConnex.pdf"}, {"id": "DE-HE-RAUNHEIM-VANTAGE-FRA21", "country": "Germany", "municipality": "Raunheim", "operator": "VDC FRA21 GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2023-03-31", "it_mw": null, "grid_mw": null, "backup_generators": 28, "thermal_mw": 199.528, "engine_makes": "Caterpillar", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-05/fra21_rechenzentrum_genehmigungsbescheid_final.pdf"}, {"id": "DE-HE-RAUNHEIM-VANTAGE-FRA22", "country": "Germany", "municipality": "Raunheim", "operator": "VDC FRA22 GmbH (Vantage Data Centers FRA22 GmbH)", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-02-16", "it_mw": null, "grid_mw": null, "backup_generators": 11, "thermal_mw": 78.386, "engine_makes": "Caterpillar", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-03/24_02_16_genehmigungsbescheid_final_rz_raunheim_vantage_fra_22_gez.pdf"}, {"id": "DE-HE-HATTERSHEIM-DIGITALFRANKFURT2-FRA33", "country": "Germany", "municipality": "Hattersheim am Main", "operator": "Digital Frankfurt 2 B.V.", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-08-09", "it_mw": null, "grid_mw": null, "backup_generators": 33, "thermal_mw": 189.0, "engine_makes": "Cummins", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-10/besch-ie-rl_digital-f_2024-08-09.pdf"}, {"id": "DE-HE-KELSTERBACH-A100ROW", "country": "Germany", "municipality": "Kelsterbach", "operator": "A100 ROW GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-04-04", "it_mw": null, "grid_mw": null, "backup_generators": 19, "thermal_mw": 141.0, "engine_makes": "MTU", "source_authority": "Regierungspräsidium Darmstadt", "source_url": "https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-04/24_04_04_genehmigungsbescheid_final_rz_kelsterbach_a_100_row.pdf"}, {"id": "DE-HE-FRANKFURT-MIINVESTITIONS-FKQ1", "country": "Germany", "municipality": "Frankfurt am Main (Griesheim)", "operator": "MI Investitions GmbH", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2023-12-22", "it_mw": null, "grid_mw": null, "backup_generators": 36, "thermal_mw": 242.8, "engine_makes": "Caterpillar", "source_authority": "Regierungspräsidium Kassel", "source_url": "https://rp-kassel.hessen.de/sites/rp-darmstadt.hessen.de/files/2024-01/Genehmigungsbescheid%20MI%20Investitions%20GmbH.pdf"}, {"id": "DE-HE-FRANKFURT-INTERXION-DPF", "country": "Germany", "municipality": "Frankfurt am Main (Fechenheim)", "operator": "InterXion Real Estate XXII B.V.", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2023-11-28", "it_mw": null, "grid_mw": null, "backup_generators": 64, "thermal_mw": 459.0, "engine_makes": "MTU; Mitsubishi", "source_authority": "UVP-Portal", "source_url": "https://www.uvp-verbund.de/documents-ige-ng/igc_he/4ac70157-8eb1-4bd3-a5c0-dd7c46cb010b/Ver%C3%B6ffentlichungstext_DPF_Bescheid-Gen2021-040_StAnz.docx"}, {"id": "DE-BE-BERLIN-BMDF-MARIENPARK", "country": "Germany", "municipality": "Berlin (Mariendorf)", "operator": "BMDF Gewerbepark Berlin-Mariendorf GmbH & Co. KG", "stage": "Emissions permit granted (BImSchG)", "filing_date": "2024-12-02", "it_mw": null, "grid_mw": null, "backup_generators": 48, "thermal_mw": 284.0, "engine_makes": "", "source_authority": "UVP-Portal", "source_url": "https://uvp-verbund.de/documents-ige-ng/igc_be/128b757a-9adf-4928-b61a-bab5d33a893a/20241202%20Genehmigung%20Reinschrift.pdf"}, {"id": "DE-BE-BERLIN-DATACASTLE-SPANDAU", "country": "Germany", "municipality": "Berlin (Spandau)", "operator": "AG Datacastle Spandau B.V.", "stage": "Emissions permit application (BImSchG)", "filing_date": "2024-11-01", "it_mw": null, "grid_mw": null, "backup_generators": 18, "thermal_mw": 106.02, "engine_makes": "", "source_authority": "UVP-Portal", "source_url": "https://uvp-verbund.de/documents-ige-ng/igc_be/3edd73f5-12dd-49c1-bfe8-90bfcac90131/20241101%20Bekanntmachung%20UVP-Vorpr%C3%BCfung%20The%20Hub.pdf"}, {"id": "DE-BE-BERLIN-R44VISION-MARZAHN", "country": "Germany", "municipality": "Berlin (Marzahn)", "operator": "R44 Vision DC GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2026-07-13", "it_mw": null, "grid_mw": null, "backup_generators": 14, "thermal_mw": 111.846, "engine_makes": "", "source_authority": "Senate of Berlin", "source_url": "https://www.berlin.de/sen/uvk/_assets/umwelt/bekanntmachungen/20260713_bek_ic210-14099.pdf"}, {"id": "DE-BE-BERLIN-AVENTOS-MOTARDSTRASSE", "country": "Germany", "municipality": "Berlin (Siemensstadt)", "operator": "Aventos Eta Investment GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2025-05-21", "it_mw": null, "grid_mw": null, "backup_generators": 36, "thermal_mw": 213.0, "engine_makes": "MTU", "source_authority": "UVP-Portal", "source_url": "https://www.uvp-verbund.de/documents-ige-ng/igc_be/02f04d4d-fbfb-4f7a-8556-6aea024d45e2/Bekanntmachung_IC202-13918.pdf"}, {"id": "DE-BB-LUEBBENAU-DATABLOCK2-DC2", "country": "Germany", "municipality": "Lübbenau/Spreewald (Groß-Klessow)", "operator": "Data Block II GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2025-05-27", "it_mw": null, "grid_mw": null, "backup_generators": 73, "thermal_mw": 571.0, "engine_makes": "MTU; Volvo Penta", "source_authority": "UVP-Portal", "source_url": "https://www.uvp-verbund.de/documents-ige-ng/igc_bb/9e378fb2-3825-4203-bda8-5fff2255c09d/Bekanntmachung%20Vorhaben%2040.102.00_24_m.%20UVP_Kein%20WR.pdf"}, {"id": "DE-BB-TREBBIN-SDC-B1", "country": "Germany", "municipality": "Trebbin", "operator": "SDC T Lux Investor S.à r.l.", "stage": "Emissions permit application (BImSchG)", "filing_date": "2025-06-06", "it_mw": null, "grid_mw": null, "backup_generators": 25, "thermal_mw": 187.0, "engine_makes": "", "source_authority": "UVP-Portal", "source_url": "https://www.uvp-verbund.de/documents-ige-ng/igc_bb/b18fc926-7fb9-4645-a65e-8560f963a1a3/Bekanntmachung%20UVP-Vorpr%C3%BCfung%20-%20Unterbleiben%20UVP.pdf"}, {"id": "DE-NW-BERGHEIM-MICROSOFT-NRW01", "country": "Germany", "municipality": "Bergheim (Paffendorf)", "operator": "Microsoft Deutschland MCIO GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2026-05-19", "it_mw": null, "grid_mw": null, "backup_generators": 36, "thermal_mw": 300.0, "engine_makes": "", "source_authority": "Bezirksregierung Köln", "source_url": "https://www.bezreg-koeln.nrw.de/bekanntmachungen?type=83&page=0"}, {"id": "DE-NW-BEDBURG-MICROSOFT-NRW08-09", "country": "Germany", "municipality": "Bedburg", "operator": "Microsoft Deutschland MCIO GmbH", "stage": "Emissions permit application (BImSchG)", "filing_date": "2026-07-29", "it_mw": null, "grid_mw": null, "backup_generators": 66, "thermal_mw": 545.3, "engine_makes": "", "source_authority": "Bezirksregierung Köln", "source_url": "https://www.bezreg-koeln.nrw.de/bekanntmachungen?type=83&page=0"}, {"id": "FR-IDF-LEBOURGET-SEGRO", "country": "France", "municipality": "Le Bourget", "operator": "Segro Bourget", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-06-30", "it_mw": null, "grid_mw": 75.0, "backup_generators": 33, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2025_06_30_bourget_centre_de_donnees_segro_avis_signe.pdf"}, {"id": "FR-IDF-DUGNY-DIGITALREALTY-HUB", "country": "France", "municipality": "Dugny", "operator": "Digital Dugny", "stage": "Environmental-authority opinion", "filing_date": "2024-04-11", "it_mw": null, "grid_mw": null, "backup_generators": 108, "thermal_mw": 814.0, "engine_makes": "", "source_authority": "Autorité environnementale (IGEDD)", "source_url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/240411_centre_donnees_dugny_digital_hub_93_debattu_corrige_cle565e1b.pdf"}, {"id": "FR-PACA-BOUCBELAIR-DIGITALREALTY-MRS6", "country": "France", "municipality": "Bouc-Bel-Air", "operator": "Digital Realty", "stage": "Environmental-authority opinion", "filing_date": "2025-06-12", "it_mw": null, "grid_mw": 80.0, "backup_generators": 32, "thermal_mw": 219.0, "engine_makes": "", "source_authority": "Autorité environnementale (IGEDD)", "source_url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/4_-_centre_de_donnees_a_bouc-bel-air_13__cle71f681.pdf"}, {"id": "FR-IDF-VILLENEUVESTGEORGES-GOODMAN-PARII", "country": "France", "municipality": "Villeneuve-Saint-Georges", "operator": "Pôle Villa Nova 1 SNC", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2024-05-02", "it_mw": null, "grid_mw": null, "backup_generators": 84, "thermal_mw": 642.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2024-05-02_villeneuve-saint-georges_datacenter_pole_villa_nova_1_snc_goodman_avis_delibere.pdf"}, {"id": "FR-IDF-TREMBLAY-GOODMAN", "country": "France", "municipality": "Tremblay-en-France", "operator": "Goodman France", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2023-11-02", "it_mw": 105.0, "grid_mw": 105.0, "backup_generators": 54, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2023-11-02_tremblay-en-france_data_center_goodman_avis_delibere.pdf"}, {"id": "FR-IDF-MARCOUSSIS-DATA4-ZONE2NORD", "country": "France", "municipality": "Marcoussis", "operator": "DATA 4 Services", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2023-08-09", "it_mw": 60.0, "grid_mw": 100.0, "backup_generators": 48, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2023-08-09_marcoussis_91__projet_extension_data_center4_avis_delibere_.pdf"}, {"id": "FR-IDF-VILLEBON-COLT", "country": "France", "municipality": "Villebon-sur-Yvette", "operator": "COLT DCS Developments France", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2023-03-09", "it_mw": null, "grid_mw": 120.0, "backup_generators": 27, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2023-03-09_villebon-sur-yvette_avis_projet_creation_data-center_avis_delibere.pdf"}, {"id": "FR-IDF-MAGNY-TELEHOUSE-TH3-P2", "country": "France", "municipality": "Magny-les-Hameaux", "operator": "Telehouse International Corporation of Europe Ltd", "stage": "Public consultation", "filing_date": "2023-10-03", "it_mw": null, "grid_mw": null, "backup_generators": 3, "thermal_mw": 19.38, "engine_makes": "", "source_authority": "Préfecture des Yvelines", "source_url": "https://www.yvelines.gouv.fr/index.php/contenu/telechargement/30740/197794/file/Rapport.pdf"}, {"id": "FR-IDF-MAGNY-TELEHOUSE-NOUVEAU-BATIMENT", "country": "France", "municipality": "Magny-les-Hameaux", "operator": "Telehouse", "stage": "Public consultation", "filing_date": "2026-06-18", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Public consultation register (France)", "source_url": "https://www.registre-dematerialise.fr/7391/download/document/7295/Avis%20de%20consultation%20du%20public"}, {"id": "FR-PACA-MARSEILLE-DIGITALREALTY-MRS5", "country": "France", "municipality": "Marseille (2e arr., quartier de la Calade, Grand Port Maritime)", "operator": "Digital MRS5", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2024-04-04", "it_mw": null, "grid_mw": null, "backup_generators": 14, "thermal_mw": 103.18, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2024appaca16.pdf"}, {"id": "FR-PACA-MARSEILLE-SEGRO-MR1", "country": "France", "municipality": "Marseille (16e arr., zone Actisud)", "operator": "SEGRO Urban Logistics MR1", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2024-06-13", "it_mw": null, "grid_mw": null, "backup_generators": 20, "thermal_mw": 102.4, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2024appaca30.pdf"}, {"id": "FR-IDF-ARGENTEUIL-EQUINIX-PA16", "country": "France", "municipality": "Argenteuil", "operator": "Equinix France SAS", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-04-23", "it_mw": null, "grid_mw": 240.0, "backup_generators": 18, "thermal_mw": 142.2, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2025-04-23-avis_projet_dc_pa_16_argenteuil_equinix_avis_delibere_.pdf"}, {"id": "FR-IDF-ARGENTEUIL-EQUINIX-PA12X", "country": "France", "municipality": "Argenteuil", "operator": "Equinix Hyperscale 2", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2021-11-18", "it_mw": null, "grid_mw": null, "backup_generators": 22, "thermal_mw": null, "engine_makes": "", "source_authority": "DRIEAT Île-de-France", "source_url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/IMG/pdf/2021-11-18_avis_data_center_argenteuil_delibere.pdf"}, {"id": "FR-IDF-FOUJU-CAMPUSIA", "country": "France", "municipality": "Fouju", "operator": "Campus IA", "stage": "Permit granted", "filing_date": "2025-10-13", "it_mw": null, "grid_mw": 700.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Commission nationale du débat public", "source_url": "https://www.debatpublic.fr/sites/default/files/2025-10/1234-campusia-dossier-de-concertation-vff-web_a9652f7dbce0d3e25a51a79770df7849.pdf"}, {"id": "FR-IDF-WISSOUS-CYRUSONE", "country": "France", "municipality": "Wissous", "operator": "Société anonymisée dans le jugement", "stage": "Refused or not admitted", "filing_date": "2025-01-28", "it_mw": null, "grid_mw": 60.0, "backup_generators": 15, "thermal_mw": 49.5, "engine_makes": "", "source_authority": "Commune de Wissous", "source_url": "https://www.wissous.fr/userfile/documents/CyrusOne_Projet%20de%20datacenter%20%C3%A0%20Wissous%20%28augmentation%20capacit%C3%A9s%20du%20data%20center%29.pdf"}, {"id": "FR-CVL-MAINVILLIERS-ORANGE", "country": "France", "municipality": "Mainvilliers / Amilly", "operator": "Orange SA", "stage": "Other filing", "filing_date": "2025-07-09", "it_mw": null, "grid_mw": null, "backup_generators": 18, "thermal_mw": 87.12, "engine_makes": "", "source_authority": "Géorisques (French installations register)", "source_url": "https://georisques.gouv.fr/webappReport/ws/installations/inspection/5Y6Deq9T6hsmBSp0eaUMSi2a1ugvLuWb"}, {"id": "FR-IDF-LESULIS-DIGITAL-DC1-DC2", "country": "France", "municipality": "Les Ulis (parc de Courtabœuf)", "operator": "Digital Les Ulis", "stage": "Environmental-authority opinion", "filing_date": "2021-12-09", "it_mw": null, "grid_mw": null, "backup_generators": 64, "thermal_mw": 423.0, "engine_makes": "", "source_authority": "Autorité environnementale (IGEDD)", "source_url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/211209_centre_donnees_ulis91_delibere_cle26febf.pdf"}, {"id": "FR-IDF-LACOURNEUVE-INTERXION-PAR8-PAR11", "country": "France", "municipality": "La Courneuve", "operator": "Interxion France", "stage": "Other filing", "filing_date": "2025-05-23", "it_mw": null, "grid_mw": null, "backup_generators": 72, "thermal_mw": 355.75, "engine_makes": "Kohler (Rehlko)", "source_authority": "Géorisques (French installations register)", "source_url": "https://georisques.gouv.fr/webappReport/ws/installations/inspection/GHRNDIb4uTay9Tb1TTjAAz8QJB1mhqX2"}, {"id": "FR-IDF-LESULIS-COLT-DH10", "country": "France", "municipality": "Les Ulis (ZA de Courtabœuf)", "operator": "Colt Technology Services", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2021-01-14", "it_mw": 12.8, "grid_mw": null, "backup_generators": 9, "thermal_mw": 52.0, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/210114_mrae_avis_delibere_extension_datacenter_colt_les_ulis_78_.pdf"}, {"id": "FR-IDF-BAILLY-BNPPARIBAS-MAE2", "country": "France", "municipality": "Bailly-Romainvilliers", "operator": "BNP Paribas", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2021-08-18", "it_mw": null, "grid_mw": null, "backup_generators": 6, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2021-08-18__avis_data_center_bailly_77_v_deliberee.pdf"}, {"id": "FR-IDF-LISSES-CLOUDHQ", "country": "France", "municipality": "Lisses", "operator": "CloudHQ France", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2021-05-15", "it_mw": null, "grid_mw": 240.0, "backup_generators": 114, "thermal_mw": 608.0, "engine_makes": "", "source_authority": "DRIEAT Île-de-France", "source_url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/IMG/pdf/2021-08-15__avis_projet_dc_lisses91_150521__signe.pdf"}, {"id": "FR-IDF-FERRIERES-VIRIDI-PARIS2", "country": "France", "municipality": "Ferrières-en-Brie", "operator": "Viridi Data Paris 2 SAS", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2018-02-08", "it_mw": null, "grid_mw": null, "backup_generators": 8, "thermal_mw": 38.4, "engine_makes": "", "source_authority": "DRIEAT Île-de-France", "source_url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/IMG/pdf/180208_mrae_avis_sur_projet_data_center_ferrieres-en-brie_77_.pdf"}, {"id": "FR-IDF-MEUDON-BOUYGUESIMMO-DC", "country": "France", "municipality": "Meudon (Meudon-la-Forêt)", "operator": "Bouygues Immobilier", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2019-01-10", "it_mw": null, "grid_mw": null, "backup_generators": 24, "thermal_mw": 132.0, "engine_makes": "", "source_authority": "DRIEAT Île-de-France", "source_url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/IMG/pdf/190110_mrae_idf_avis_delibere_sur_projet_data_center_a_meudon_92_.pdf"}, {"id": "FR-IDF-MARCOUSSIS-DATA4-ZONES2-3", "country": "France", "municipality": "Marcoussis", "operator": "DATA 4 Services", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2020-04-23", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "DRIEAT Île-de-France", "source_url": "https://www.drieat.ile-de-france.developpement-durable.gouv.fr/IMG/pdf/200423_mrae_avis_delibere_projet_extension_datacenter_marcoussis_91_.pdf"}, {"id": "FR-PACA-MARSEILLE-INTERXION-MRS4", "country": "France", "municipality": "Marseille (13015, La Calade, Grand Port Maritime)", "operator": "Interxion France", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2020-10-01", "it_mw": null, "grid_mw": 80.0, "backup_generators": 12, "thermal_mw": 59.29, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/2020appaca43.pdf"}, {"id": "FR-BFC-SAINTAPOLLINAIRE-EUROINFORMATION", "country": "France", "municipality": "Saint-Apollinaire", "operator": "Euro-Information SAS", "stage": "Application filed", "filing_date": "2021-01-15", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": 30.6, "engine_makes": "", "source_authority": "Géorisques (French installations register)", "source_url": "https://georisques.gouv.fr/webappReport/ws/installations/document/8a9500af771aec2301771b42d4eb0087"}, {"id": "FR-IDF-VITRY-OPCORE-DC3", "country": "France", "municipality": "Vitry-sur-Seine", "operator": "OPCORE", "stage": "Other filing", "filing_date": "2024-02-12", "it_mw": null, "grid_mw": null, "backup_generators": 17, "thermal_mw": 49.47, "engine_makes": "", "source_authority": "Géorisques (French installations register)", "source_url": "https://www.georisques.gouv.fr/webappReport/ws/installations/inspection/5VS5FFLcp2Cz8OKQa1shxSND78Vhu4Vz"}, {"id": "FR-IDF-BONNEUIL-SUCY-DATACENTER", "country": "France", "municipality": "Bonneuil-sur-Marne / Sucy-en-Brie", "operator": "", "stage": "Environmental-authority opinion (MRAe)", "filing_date": "2025-04-23", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Mission régionale d'autorité environnementale (MRAe)", "source_url": "https://www.mrae.developpement-durable.gouv.fr/IMG/pdf/pv_seance_du_23_avril_2025_avis_adopte-1.pdf"}, {"id": "GB-LND-HAYES-VIRTUS-LONDON14", "country": "United Kingdom", "municipality": "Hayes", "operator": "Virtus Holdco Limited", "stage": "Environmental permit granted", "filing_date": "2025-03-04", "it_mw": null, "grid_mw": null, "backup_generators": 16, "thermal_mw": 110.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/67ceee211e2f37b1f3fd1401/Decision_Document_London_14_Data_Centre.pdf"}, {"id": "GB-BRK-SLOUGH-KD2-KLON06", "country": "United Kingdom", "municipality": "Slough (Slough Trading Estate)", "operator": "KD 2 Limited", "stage": "Environmental permit granted", "filing_date": "2025-01-22", "it_mw": null, "grid_mw": null, "backup_generators": 13, "thermal_mw": 99.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/67938f8c7b75412c254f4b0e/Application_Bespoke_A001_-_Decision_Document_-_22012025.pdf"}, {"id": "GB-SRY-REDHILL-DLR-LGW10-11", "country": "United Kingdom", "municipality": "Redhill (Foxboro Park, St Anne's Boulevard)", "operator": "Digital Realty (UK) Limited", "stage": "Environmental permit granted", "filing_date": "2025-02-11", "it_mw": null, "grid_mw": null, "backup_generators": 21, "thermal_mw": 72.4, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/67adda2a2c594609b38acd39/Application_Bespoke_A001_Decision_Document_-_11_02_2025.pdf"}, {"id": "GB-WSX-CRAWLEY-DLR-CAMPUS", "country": "United Kingdom", "municipality": "Crawley", "operator": "Digital Realty (UK) Limited", "stage": "Environmental permit granted", "filing_date": "2025-06-02", "it_mw": null, "grid_mw": null, "backup_generators": 17, "thermal_mw": 72.6, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6846bf6757f3515d9611f0e3/Application_Bespoke_A001_Decision_Document_-_02062025.pdf"}, {"id": "GB-LND-HAYES-ARK-UNIONPARK-EC3", "country": "United Kingdom", "municipality": "Hayes (Union Park)", "operator": "Ark Data Centres Limited", "stage": "Environmental permit granted", "filing_date": "2025-10-06", "it_mw": null, "grid_mw": null, "backup_generators": 12, "thermal_mw": 96.12, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/68e64d9649e17d00a56fff0e/Application_Bespoke_A001_Decision_Document_-_03102025.pdf"}, {"id": "GB-BDF-HOUGHTONREGIS-AMAZON-LINMERE", "country": "United Kingdom", "municipality": "Houghton Regis (Sundon Road)", "operator": "Amazon Data Services UK Limited", "stage": "Environmental permit granted", "filing_date": "2026-01-29", "it_mw": null, "grid_mw": null, "backup_generators": 42, "thermal_mw": 324.6, "engine_makes": "Caterpillar", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/69846ade468d351e1406b4b8/Application_Bespoke_A001_Decision_Document_-_29012026.pdf"}, {"id": "GB-ESS-HARLOW-KAO-KLON03", "country": "United Kingdom", "municipality": "Harlow", "operator": "Harlow Operations Limited", "stage": "Permit variation granted", "filing_date": "2026-06-03", "it_mw": null, "grid_mw": null, "backup_generators": 25, "thermal_mw": 152.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6a202c72dbcb60fc6ccb29d2/Application_Variation_V002_Decision_Document_-_03062026.pdf"}, {"id": "GB-BRK-SLOUGH-VIRTUS-LON12", "country": "United Kingdom", "municipality": "Slough (14 Liverpool Road)", "operator": "Virtus Holdco Limited", "stage": "Permit variation granted", "filing_date": "2026-04-15", "it_mw": null, "grid_mw": null, "backup_generators": 47, "thermal_mw": 281.95, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/69e6018844a079b27f997f50/Application_Variation_V003_Decision_Document_-_15042026.pdf"}, {"id": "GB-OXF-DIDCOT-AMAZON-NORTH", "country": "United Kingdom", "municipality": "Didcot (ancienne centrale Didcot A)", "operator": "Amazon Data Services UK Limited", "stage": "Environmental permit granted", "filing_date": "2026-07-27", "it_mw": null, "grid_mw": null, "backup_generators": 129, "thermal_mw": 925.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6a7077d10ddb7e4831c62b62/Application_Bespoke_A001_Permit_-27072026.pdf"}, {"id": "GB-BRK-SLOUGH-IRONMOUNTAIN-LON3", "country": "United Kingdom", "municipality": "Slough (111 Buckingham Avenue)", "operator": "Iron Mountain (UK) Data Centre Limited", "stage": "Environmental permit granted", "filing_date": "2026-01-07", "it_mw": null, "grid_mw": null, "backup_generators": 17, "thermal_mw": 113.31, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6968eb235fd54abe6531a7ed/Application_Bespoke_A001_Permit_Issue_-_07012026.pdf"}, {"id": "GB-LND-BRENT-PDCG-STAPLESCORNER", "country": "United Kingdom", "municipality": "London (Staples Corner, JVC Business Park)", "operator": "PDCG (Group Services) Limited", "stage": "Permit variation granted", "filing_date": "2025-05-20", "it_mw": null, "grid_mw": null, "backup_generators": 56, "thermal_mw": 409.36, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/68371f0e4115cfe5bfaa2cb0/Application_Variation_V002_Permit_-_20052025.pdf"}, {"id": "GB-BRK-SLOUGH-EQUINIX-LD14", "country": "United Kingdom", "municipality": "Slough (Slough Trading Estate, Buckingham Avenue)", "operator": "Equinix (UK) Limited", "stage": "Permit variation granted", "filing_date": "2025-08-29", "it_mw": null, "grid_mw": null, "backup_generators": 89, "thermal_mw": 495.5, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/68bed2cdde0987fe84e0dd49/Application_Variation_V004_Notice_Issued_-_29082025.pdf"}, {"id": "GB-BRK-SLOUGH-YONDR-WEXHAMROAD", "country": "United Kingdom", "municipality": "Slough (Wexham Road)", "operator": "Yondr Group Limited", "stage": "Environmental permit granted", "filing_date": "2023-11-29", "it_mw": null, "grid_mw": null, "backup_generators": 52, "thermal_mw": 295.0, "engine_makes": "MTU", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6566050a75007400131ded52/Decision_Document_NP3829SP.pdf"}, {"id": "GB-LND-HAYES-COLT-HAYES", "country": "United Kingdom", "municipality": "Hayes (Brook Industrial Estate)", "operator": "Colt Data Centre Services UK Limited", "stage": "Environmental permit granted", "filing_date": "2025-07-30", "it_mw": null, "grid_mw": null, "backup_generators": 46, "thermal_mw": 283.0, "engine_makes": "MTU", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6899eccdad0cbc0e27643221/Application_Bespoke_A001_Decision_document_-_30_07_2025.pdf"}, {"id": "GB-LND-EALING-COLT-POWERGATE", "country": "United Kingdom", "municipality": "London (Park Royal, Powergate Business Park)", "operator": "Colt Data Centre Services UK Ltd", "stage": "Environmental permit granted", "filing_date": "2024-05-23", "it_mw": null, "grid_mw": null, "backup_generators": 13, "thermal_mw": 62.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6659b3d58f90ef31c23ebcd9/Applicatin_Bespoke_Decision_Document_23052024.pdf"}, {"id": "GB-LND-ROMFORD-GREENMOUNTAIN-NORTH", "country": "United Kingdom", "municipality": "Romford", "operator": "Green Mountain DC UK Limited", "stage": "Permit variation granted", "filing_date": "2026-02-19", "it_mw": null, "grid_mw": null, "backup_generators": 17, "thermal_mw": null, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/69a160a1c497bac082bc776c/Application_Variation_V002_Decision_Document_-_19022026.pdf"}, {"id": "GB-LND-HAYES-AMAZON-UNIONPARK-EC2", "country": "United Kingdom", "municipality": "Hayes (Bulls Bridge Industrial Estate, North Hyde Gardens)", "operator": "Amazon Data Services UK Limited", "stage": "Permit variation granted", "filing_date": "2024-12-05", "it_mw": null, "grid_mw": null, "backup_generators": 28, "thermal_mw": 224.25, "engine_makes": "MTU", "source_authority": "Environment Agency", "source_url": "https://consult.environment-agency.gov.uk/psc/ub3-4dg-amazon-data-services-uk-ltd-dp3442qv-v002/supporting_documents/Application%20%20Variation%20V002%20%20NonTechnical%20Summary%2020122024.pdf"}, {"id": "GB-BKM-SAUNDERTON-VIRTUS-LON15-18", "country": "United Kingdom", "municipality": "Saunderton (Haw Lane)", "operator": "Virtus Holdco Limited", "stage": "Environmental permit application", "filing_date": "2026-04-23", "it_mw": 78.0, "grid_mw": null, "backup_generators": 57, "thermal_mw": 356.22, "engine_makes": "Baudouin", "source_authority": "Environment Agency", "source_url": "https://consult.environment-agency.gov.uk/psc/hp14-4jd-virtus-holdco-limited-epr-sp3429ln-a001/supporting_documents/non-technical-summarypdf"}, {"id": "GB-BKM-IVER-AMAZON-THORNEYLANE", "country": "United Kingdom", "municipality": "Iver (Thorney Business Park, Thorney Lane North)", "operator": "Amazon Data Services UK Limited", "stage": "Environmental permit application", "filing_date": "2026-02-23", "it_mw": null, "grid_mw": null, "backup_generators": 38, "thermal_mw": null, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://consult.environment-agency.gov.uk/psc/sl0-9ee-amazon-data-services-uk-limited/supporting_documents/application-bespoke-sp3224lp-app-nts-non-technical-summary-final-2026-02-23-epr-mp3824mg-a001-020326pdf"}, {"id": "GB-BKM-IVER-AMAZON-RIDGEWAY", "country": "United Kingdom", "municipality": "Iver (Ridgeway Trading Estate)", "operator": "Amazon Data Services UK Limited", "stage": "Environmental permit application", "filing_date": "2026-08-13", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://www.gov.uk/government/publications/sl0-9jq-amazon-data-services-uk-limited-environmental-permit-application-advertisement-eprtp3621mma001/sl0-9jq-amazon-data-services-uk-limited-environmental-permit-application-advertisement-eprtp3621mma001"}, {"id": "GB-BST-AVONMOUTH-ADC", "country": "United Kingdom", "municipality": "Bristol (Severn Road, Avonmouth / Pilning)", "operator": "Avonmouth Data Centre Limited", "stage": "Environmental permit application", "filing_date": "2026-05-21", "it_mw": null, "grid_mw": null, "backup_generators": 32, "thermal_mw": 233.28, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://consult.environment-agency.gov.uk/psc/bs11-0yu-avonmouth-data-centre-limited/supporting_documents/non-technical-summarypdf"}, {"id": "GB-HRT-HEMEL-AMAZON", "country": "United Kingdom", "municipality": "Hemel Hempstead (Prologis Industrial Park)", "operator": "Amazon Data Services UK Limited", "stage": "Environmental permit granted", "filing_date": "2023-12-19", "it_mw": null, "grid_mw": null, "backup_generators": 34, "thermal_mw": 222.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6582d797fc07f300128d456a/Application_Bespoke_Decision_Document_-_19122023.pdf"}, {"id": "GB-LND-DAGENHAM-NTT-LON1B", "country": "United Kingdom", "municipality": "Dagenham", "operator": "NTT Global Data Centers EMEA UK Ltd", "stage": "Permit variation granted", "filing_date": "2024-12-17", "it_mw": null, "grid_mw": null, "backup_generators": 52, "thermal_mw": 335.15, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/6769485a4e2d5e9c0bde9d1f/Application_Variation_V003_Decision_Document_-_17122024.pdf"}, {"id": "GB-LND-EALING-EQUINIX-POWERGATE", "country": "United Kingdom", "municipality": "London (Park Royal, 2 Powergate Business Park, Volt Avenue)", "operator": "Equinix (UK) Limited", "stage": "Permit variation granted", "filing_date": "2023-12-21", "it_mw": null, "grid_mw": null, "backup_generators": 33, "thermal_mw": 199.0, "engine_makes": "", "source_authority": "Environment Agency", "source_url": "https://assets.publishing.service.gov.uk/media/659d56477e39680013a81a40/Variation_Notice_TP3500PB-V003.pdf"}, {"id": "IE-MH-DROGHEDA-AMAZON-P1181", "country": "Ireland", "municipality": "Drogheda (IDA Business and Technology Park, Donore Road)", "operator": "Amazon Data Services Ireland Ltd", "stage": "Industrial-emissions licence application", "filing_date": "2025-09-01", "it_mw": null, "grid_mw": null, "backup_generators": 54, "thermal_mw": 358.17, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b280958cd1.pdf"}, {"id": "IE-DUB-BALLYCOOLIN-SDR4-ORION", "country": "Ireland", "municipality": "Dublin 15 (Ballycoolin, Orion Business Campus)", "operator": "South Dublin Routing 4 No. 2 Limited", "stage": "Industrial-emissions licence application", "filing_date": "2024-09-01", "it_mw": null, "grid_mw": null, "backup_generators": 10, "thermal_mw": null, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b2808f5072.pdf"}, {"id": "IE-DUB-CLONDALKIN-VANTAGE-DUB11-B13", "country": "Ireland", "municipality": "Clondalkin (Ballybane and Kilbride)", "operator": "Vantage Data Centers DUB11 Ltd.", "stage": "Refused or not admitted", "filing_date": "2025-04-07", "it_mw": null, "grid_mw": null, "backup_generators": 14, "thermal_mw": null, "engine_makes": "", "source_authority": "South Dublin County Council", "source_url": "https://planning.southdublin.ie/Home/ViewWeeklyListDocument/3695"}, {"id": "IE-DUB-CLONDALKIN-EQUINIX-DB8", "country": "Ireland", "municipality": "Clondalkin (Profile Park, Plot 100, Nangor Road)", "operator": "Equinix (Ireland) Limited", "stage": "Refused or not admitted", "filing_date": "2025-02-19", "it_mw": null, "grid_mw": null, "backup_generators": 9, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/en-ie/case/317936"}, {"id": "IE-DUB-FINGLAS-HUNTSTOWN", "country": "Ireland", "municipality": "Finglas (Huntstown, North Road)", "operator": "Huntstown Power Company Limited", "stage": "Planning permission granted on appeal", "filing_date": "2025-02-27", "it_mw": null, "grid_mw": null, "backup_generators": 58, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/anbordpleanala/media/abp/cases/orders/313/d313583.pdf"}, {"id": "IE-CE-ENNIS-ARTDC", "country": "Ireland", "municipality": "Ennis (Tulla Road)", "operator": "Art Data Centres Ltd", "stage": "Refused or not admitted", "filing_date": "2024-04-05", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/en-ie/case/314474"}, {"id": "IE-MO-KILLALA-MAYODATAHUB", "country": "Ireland", "municipality": "Killala (Mullafarry and Tawnaghmore Upper)", "operator": "Mayo Data Hub Limited", "stage": "Refused or not admitted", "filing_date": "2025-05-21", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "An Coimisiún Pleanála", "source_url": "https://www.pleanala.ie/en-ie/case/322575"}, {"id": "IE-DUB-CLONSHAUGH-AMAZON-P1186", "country": "Ireland", "municipality": "Clonshaugh (Clonshaugh Business and Technology Park)", "operator": "Amazon Data Services Ireland Ltd", "stage": "Industrial-emissions licence application", "filing_date": "2024-07-01", "it_mw": null, "grid_mw": null, "backup_generators": 52, "thermal_mw": 290.95, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b2808ec46e.pdf"}, {"id": "IE-DUB-BALDONNELL-AMAZON-P1170", "country": "Ireland", "municipality": "Baldonnell (Grange Castle South Business Park, Baldonnel Road)", "operator": "Amazon Data Services Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-07-06", "it_mw": null, "grid_mw": null, "backup_generators": 73, "thermal_mw": 460.87, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b28087f7ae.pdf"}, {"id": "IE-DUB-BALDONNELL-AMAZON-P1184", "country": "Ireland", "municipality": "Baldonnell (Grange Castle Business Park South, Baldonnell Road)", "operator": "Amazon Data Services Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-05-11", "it_mw": null, "grid_mw": null, "backup_generators": 16, "thermal_mw": 103.84, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b280875e4e.pdf"}, {"id": "IE-DUB-CLONDALKIN-MICROSOFT-DUB6-13", "country": "Ireland", "municipality": "Clondalkin (Grange Castle South Business Park)", "operator": "Microsoft Operations Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-03-01", "it_mw": null, "grid_mw": null, "backup_generators": 95, "thermal_mw": 579.28, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b280876422.pdf"}, {"id": "IE-DUB-CLONDALKIN-MICROSOFT-DB3-5", "country": "Ireland", "municipality": "Clondalkin (Grange Castle South Business Park)", "operator": "Microsoft Operations Ireland Ltd", "stage": "Industrial-emissions licence application", "filing_date": "2023-03-01", "it_mw": null, "grid_mw": null, "backup_generators": 41, "thermal_mw": 212.58, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b28086a720.pdf"}, {"id": "IE-DUB-BLANCHARDSTOWN-AMAZON-P1172", "country": "Ireland", "municipality": "Blanchardstown (Blanchardstown Industrial Park, Snugborough Road)", "operator": "Amazon Data Services Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-06-08", "it_mw": null, "grid_mw": null, "backup_generators": 70, "thermal_mw": 416.52, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b28087bd24.pdf"}, {"id": "IE-DUB-TALLAGHT-AMAZON-P1177", "country": "Ireland", "municipality": "Tallaght (Hibernian Industrial Estate, Greenhills Road)", "operator": "Amazon Data Services Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-05-10", "it_mw": null, "grid_mw": null, "backup_generators": 46, "thermal_mw": 251.43, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b2808746ab.pdf"}, {"id": "IE-DUB-TALLAGHT-AMAZON-P1173", "country": "Ireland", "municipality": "Tallaght (Airton Road)", "operator": "Amazon Data Services Ireland Limited", "stage": "Industrial-emissions licence application", "filing_date": "2023-01-20", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Environmental Protection Agency (Ireland)", "source_url": "https://epawebapp.epa.ie/licences/lic_eDMS/090151b28085f950.pdf"}, {"id": "NO-TRONDELAG-TYDAL-TDC-FASE2", "country": "Norway", "municipality": "Tydal (Stugudalsvegen)", "operator": "Tydal Data Center AS", "stage": "Grid concession granted", "filing_date": "2025-03-28", "it_mw": null, "grid_mw": 180.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/d4dc1fea-cdf5-45a7-bbfd-e4c302c05854/202406238/3443915"}, {"id": "NO-AGDER-VENNESLA-BULK-N01-STOLEN", "country": "Norway", "municipality": "Vennesla (Stølen / Støleheia)", "operator": "Bulk Data Centers N01 AS et al.", "stage": "Air-emissions permit application", "filing_date": "2026-10-09", "it_mw": null, "grid_mw": 400.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/agder/horinger/2026/11/horing-soknad-om-utslipp-til-luft-fra-stolen-datalagringspark/"}, {"id": "NO-AKERSHUS-ENEBAKK-GREENMOUNTAIN-OSLENE", "country": "Norway", "municipality": "Enebakk (Gran, Ytre Enebakk)", "operator": "Green Mountain AS", "stage": "Pollution permit granted", "filing_date": "2026-06-23", "it_mw": null, "grid_mw": 90.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/siteassets/fm-oslo-og-viken/horinger-og-kunngjoringer/green-mountain-as/vedtak-om-tillatelse.pdf"}, {"id": "NO-INNLANDET-HAMAR-GREENMOUNTAIN-HEGGVIN", "country": "Norway", "municipality": "Hamar (Heggvin næringspark)", "operator": "Green Mountain AS / Green Mountain Innlandet AS", "stage": "Air-emissions permit application", "filing_date": "2024-02-14", "it_mw": 90.0, "grid_mw": 110.0, "backup_generators": 130, "thermal_mw": null, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/03000120-5976-47f4-a382-1d90d6edcaff/202315098/3437013"}, {"id": "NO-TELEMARK-TINN-GREENMOUNTAIN-RJU", "country": "Norway", "municipality": "Tinn (Rjukan)", "operator": "Green Mountain AS", "stage": "Air-emissions permit application", "filing_date": "2025-12-12", "it_mw": null, "grid_mw": 112.0, "backup_generators": 12, "thermal_mw": null, "engine_makes": "", "source_authority": "NVE (Norwegian Water Resources and Energy Directorate)", "source_url": "https://webfileservice.nve.no/API/PublishedFiles/Download/90bc2c9d-5a9a-4fa4-b9b6-96376ebccb6a/202519881/3448901"}, {"id": "NO-ROGALAND-STAVANGER-GREENMOUNTAIN-SVGREN", "country": "Norway", "municipality": "Stavanger (Rennesøy, Hodneveien 260)", "operator": "Green Mountain AS", "stage": "Pollution permit granted", "filing_date": "2026-03-31", "it_mw": null, "grid_mw": null, "backup_generators": 10, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/contentassets/48b79422c72a43d196b96a31095d9435/vedtak-om-tillatelse-etter-forurensningsloven---industri---stavanger---green-mountain-as---forbrenningsanlegg-forurensningsforsk.pdf"}, {"id": "NO-ROGALAND-TIME-GREENMOUNTAIN-UNDHEIM", "country": "Norway", "municipality": "Time (Undheim)", "operator": "Green Mountain Undheim Investment AS", "stage": "Air-emissions permit application", "filing_date": "2026-10-26", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/nn/rogaland/hoyringar/2026/11/soknad-om-utsleppsloyve-til-datasenter-pa-undheim/"}, {"id": "NO-ROGALAND-SAUDA-YFOSS", "country": "Norway", "municipality": "Sauda (Handelandsvegen 140)", "operator": "Yfoss AS", "stage": "Air-emissions permit application", "filing_date": "2026-01-29", "it_mw": null, "grid_mw": 10.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/contentassets/68f174540503416f92fc5343668ad615/offentleg-hoyring--industri--sauda--yfoss-as--soknad-om-loyve-etter-forureiningslova-for-etablering-av-datasenter.pdf"}, {"id": "NO-TELEMARK-DRANGEDAL-POLARDC-DRA", "country": "Norway", "municipality": "Drangedal (Varpet, Tørdal)", "operator": "PolarDC DRA AS", "stage": "Pollution permit granted", "filing_date": "2026-09-14", "it_mw": null, "grid_mw": null, "backup_generators": 53, "thermal_mw": 260.27, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/siteassets/vestfold-og-telemark/miljo-og-klima/forurensing/dokumenter/2026/tillatelser/polar-dc/tillatelse---polardc-dra-as.pdf"}, {"id": "NO-TELEMARK-PORSGRUNN-POLARDC-HER01", "country": "Norway", "municipality": "Porsgrunn (Herøya)", "operator": "PolarDC HER AS", "stage": "Air-emissions permit application", "filing_date": "2026-01-16", "it_mw": null, "grid_mw": null, "backup_generators": 40, "thermal_mw": null, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/siteassets/fm-vestfold-og-telemark/miljo-og-klima/forurensning/dokumenter/2026/horinger/polardc-her-as/soknad-her-osl.pdf"}, {"id": "NO-TELEMARK-SKIEN-WSCOMPUTING-DS1", "country": "Norway", "municipality": "Skien (Gromstul)", "operator": "WS Computing AS", "stage": "Pollution permit granted", "filing_date": "2025-08-25", "it_mw": null, "grid_mw": null, "backup_generators": 46, "thermal_mw": 334.0, "engine_makes": "", "source_authority": "Statsforvalteren", "source_url": "https://www.statsforvalteren.no/siteassets/fm-vestfold-og-telemark/miljo-og-klima/forurensning/dokumenter/2025/kunngjoringer/ws-computing-as/tillatelse---ws-computing-as---datasenter-1---gromstul.pdf"}, {"id": "SE-AB-STOCKHOLM-ATNORTH-AKALLA", "country": "Sweden", "municipality": "Stockholm (Akalla, Kista)", "operator": "atNorth AB", "stage": "Pre-application consultation", "filing_date": "2026-01-14", "it_mw": null, "grid_mw": null, "backup_generators": 12, "thermal_mw": 100.0, "engine_makes": "", "source_authority": "Consultation file published by the operator", "source_url": "https://www.atnorth.com/wp-content/uploads/2026/02/Samradsunderlag-uppdaterat-20260114.pdf"}, {"id": "SE-AB-STOCKHOLM-DIGITALREALTY-VANDA", "country": "Sweden", "municipality": "Stockholm (Akalla, Rinkeby-Kista)", "operator": "Digital Realty AB", "stage": "Environmental permit application", "filing_date": "2025-11-26", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Mark- och miljödomstolen", "source_url": "https://energirapportering.domstol.se/globalassets/filer/domstol/nacka_tingsratt/kungorelser-mmd/nacka-tr-m-8660-25-aktbil-4.pdf"}, {"id": "SE-W-BORLANGE-ECODC-KVARNSVEDEN", "country": "Sweden", "municipality": "Borlänge (Kvarnsveden)", "operator": "EcoDC 2 AB (EcoDataCenter)", "stage": "Environmental permit granted", "filing_date": "2026-05-12", "it_mw": null, "grid_mw": null, "backup_generators": 280, "thermal_mw": 2700.0, "engine_makes": "", "source_authority": "Borlänge kommun", "source_url": "https://www.borlange.se/download/18.20c2c85d19eb7a927aae60e/1781770015551/Riskutredning%20Sevesoverksamhet.pdf"}, {"id": "SE-W-FALUN-ECODC", "country": "Sweden", "municipality": "Falun", "operator": "EcoDC Falun AB", "stage": "Environmental permit application", "filing_date": "2024-08-22", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Mark- och miljödomstolen", "source_url": "https://domstol.se/globalassets/filer/domstol/nacka_tingsratt/kungorelser-mmd/nacka-tr-m-4352-24-aktbil-9.pdf"}, {"id": "SE-Z-OSTERSUND-ECODC", "country": "Sweden", "municipality": "Östersund (Massaveden 4)", "operator": "EcoDC Östersund AB", "stage": "Environmental permit granted", "filing_date": "2025-06-23", "it_mw": null, "grid_mw": 150.0, "backup_generators": 40, "thermal_mw": 350.0, "engine_makes": "", "source_authority": "Mark- och miljödomstolen", "source_url": "https://energirapportering.domstol.se/globalassets/filer/domstol/ostersunds_tingsratt/kungorelser/dom-2009-24.pdf"}, {"id": "SE-AB-UPPLANDSVASBY-SISTO012", "country": "Sweden", "municipality": "Upplands Väsby (Älvsunda 7:10)", "operator": "SI STO 01.2 AB", "stage": "Environmental permit granted", "filing_date": "2023-05-11", "it_mw": null, "grid_mw": null, "backup_generators": 20, "thermal_mw": 58.1, "engine_makes": "", "source_authority": "Naturvårdsverket", "source_url": "https://naturvardsverket.se/49e2ab/contentassets/781859e933a341fab467a6212408a590/2023-05-11-mpd-stockholm.pdf"}, {"id": "SE-AB-STOCKHOLM-EQUINIX-SK2", "country": "Sweden", "municipality": "Stockholm (Förbrännaren 10)", "operator": "Equinix (Sweden) AB", "stage": "Environmental permit granted", "filing_date": "2023-06-08", "it_mw": null, "grid_mw": null, "backup_generators": 16, "thermal_mw": 88.3, "engine_makes": "", "source_authority": "Naturvårdsverket", "source_url": "https://naturvardsverket.se/497b37/contentassets/781859e933a341fab467a6212408a590/240418/2023-06-08-mpd-stockholm.pdf"}, {"id": "DK-SJ-LOLLAND-RODBY", "country": "Denmark", "municipality": "Lolland (Rødby)", "operator": "", "stage": "Other filing", "filing_date": "2026-06-01", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Lolland Kommune", "source_url": "https://dagsordener.lolland.dk/vis/pdf/dagsorden/93e20f49-082b-4516-8ca4-ea51b98d9497"}, {"id": "ES-MD-MADRID-INTERXION-MAD4", "country": "Spain", "municipality": "Madrid", "operator": "Interxion España, S.L.", "stage": "Public notice: prior and construction authorisation", "filing_date": "2026-01-12", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "originjofjn-boc.comunidad.madrid", "source_url": "https://originjofjn-boc.comunidad.madrid/boletin/CM_Orden_BOCM/2026/01/12/BOCM-20260112-49.PDF"}, {"id": "ES-AR-LAPUEBLA-ACS-DC", "country": "Spain", "municipality": "La Puebla de Alfindén (CPD) / Villamayor de Gállego (SET Remota)", "operator": "ACS DC Infra La Puebla, S.L.", "stage": "Public notice: prior and construction authorisation", "filing_date": "2026-07-22", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Boletín Oficial del Estado", "source_url": "https://www.boe.es/boe/dias/2026/07/22/pdfs/BOE-B-2026-24883.pdf"}, {"id": "ES-AR-EBRO-CAMPUS-PIGA", "country": "Spain", "municipality": "Aragon", "operator": "", "stage": "Public notice: prior and construction authorisation", "filing_date": "2025-09-09", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "www.aragon.es", "source_url": "https://www.aragon.es/documents/d/guest/anuncio-boa-g-z-2025-023"}, {"id": "IT-LOMB-SETTIMO-VANTAGE-MXP2", "country": "Italy", "municipality": "Settimo Milanese (località Il Castelletto)", "operator": "VDC MXP 21 S.r.l. (Vantage Data Centers)", "stage": "Other filing", "filing_date": "2024-02-23", "it_mw": 32.0, "grid_mw": null, "backup_generators": 22, "thermal_mw": 143.0, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/987247"}, {"id": "IT-LOMB-MELEGNANO-VANTAGE-MXP1", "country": "Italy", "municipality": "Melegnano (ambito di trasformazione AT 24)", "operator": "VDC MXP11 S.r.l.", "stage": "Application filed", "filing_date": "2024-03-19", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": 293.0, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/1016680"}, {"id": "IT-LOMB-SETTIMO-MICROSOFT-MIL03", "country": "Italy", "municipality": "Settimo Milanese (località Castelletto)", "operator": "Microsoft 4825 Italy S.r.l.", "stage": "Other filing", "filing_date": "2023-12-01", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/1022095"}, {"id": "IT-LOMB-NOVIGLIO-MXPI", "country": "Italy", "municipality": "Noviglio (frazione Santa Corinna)", "operator": "Noviglio Datacenters MXP I S.r.l.", "stage": "Application filed", "filing_date": "2023-05-09", "it_mw": null, "grid_mw": null, "backup_generators": 21, "thermal_mw": 113.0, "engine_makes": "Cummins", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/856499"}, {"id": "IT-LOMB-BORNASCO-MICROSOFT-MIL05", "country": "Italy", "municipality": "Bornasco", "operator": "Microsoft 4825 Italy S.r.l.", "stage": "Other filing", "filing_date": "2023-11-14", "it_mw": null, "grid_mw": null, "backup_generators": 10, "thermal_mw": null, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/985661"}, {"id": "IT-LOMB-BORNASCO-MICROSOFT-MIL06", "country": "Italy", "municipality": "Bornasco", "operator": "Microsoft 4825 Italy S.r.l.", "stage": "Application filed", "filing_date": "2024-03-27", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/1015603"}, {"id": "IT-LOMB-SETTIMO-EQUINIX-ML7-ML8", "country": "Italy", "municipality": "Settimo Milanese (località Il Castelletto)", "operator": "Equinix Hyperscale 2 (ML7) S.r.l.", "stage": "Other filing", "filing_date": "2023-01-31", "it_mw": null, "grid_mw": null, "backup_generators": 19, "thermal_mw": 124.6, "engine_makes": "MTU", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/811434"}, {"id": "IT-LOMB-SETTIMO-EQUINIX-ML9", "country": "Italy", "municipality": "Settimo Milanese (località Il Castelletto)", "operator": "Equinix Hyperscale 2 (ML9) S.r.l.", "stage": "Application filed", "filing_date": "2024-10-15", "it_mw": null, "grid_mw": 135.0, "backup_generators": 16, "thermal_mw": 108.0, "engine_makes": "MTU", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/1165807"}, {"id": "IT-LOMB-SIZIANO-STACK-MOD2", "country": "Italy", "municipality": "Siziano (via Marche 8)", "operator": "STACK EMEA Italy S.r.l.", "stage": "Other filing", "filing_date": "2023-11-01", "it_mw": null, "grid_mw": null, "backup_generators": 12, "thermal_mw": 68.05, "engine_makes": "", "source_authority": "Ministero dell'Ambiente e della Sicurezza Energetica", "source_url": "https://va.mite.gov.it/File/Documento/967362"}, {"id": "IT-LOMB-CORNAREDO-ARU4-ALEMAGNA", "country": "Italy", "municipality": "Cornaredo", "operator": "", "stage": "Other filing", "filing_date": "2026-04-13", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "comune.cornaredo.mi.it", "source_url": "https://comune.cornaredo.mi.it/download-file/13540"}, {"id": "IT-LOMB-RHO-ATU9-EXCAMM", "country": "Italy", "municipality": "Rho / Pero (ATU9 « ex Camm »)", "operator": "", "stage": "Permit granted", "filing_date": "2025-08-08", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Comune di Rho", "source_url": "https://comune.rho.mi.it/fr-fr/download/risposta-datacenter-pdf-235-113-1365-cc0e2d35e1d47ef72838afa9d4da6eb5"}, {"id": "IT-LOMB-RHO-ATU4-CORSOEUROPA", "country": "Italy", "municipality": "Rho (ATU4, corso Europa)", "operator": "", "stage": "Other filing", "filing_date": "2025-08-08", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Comune di Rho", "source_url": "https://comune.rho.mi.it/fr-fr/download/risposta-datacenter-pdf-235-113-1365-cc0e2d35e1d47ef72838afa9d4da6eb5"}, {"id": "PT-SET-SINES-STARTCAMPUS-SINES40", "country": "Portugal", "municipality": "Sines (Zona Industrial e Logística de Sines)", "operator": "START – Sines Transatlantic Renewable & Technology Campus (Start Campus)", "stage": "Final design compliance review", "filing_date": "2024-11-13", "it_mw": 495.0, "grid_mw": null, "backup_generators": 506, "thermal_mw": null, "engine_makes": "", "source_authority": "siaia.apambiente.pt", "source_url": "https://siaia.apambiente.pt/AIADOC/RECAPE564/parecer_recape_aia363320241113135846.pdf"}, {"id": "PL-MZ-OZAROW-KCPD", "country": "Poland", "municipality": "Ożarów Mazowiecki (obręb PGR Kręczki-Kaputy)", "operator": "", "stage": "Permit granted", "filing_date": "2025-04-14", "it_mw": null, "grid_mw": null, "backup_generators": 66, "thermal_mw": null, "engine_makes": "", "source_authority": "Regional Directorate for Environmental Protection (Poland)", "source_url": "https://www.gov.pl/attachment/9744b3ca-77b1-48d4-b822-ae1c7d23b333"}, {"id": "PL-MZ-TARCZYN-KCPD", "country": "Poland", "municipality": "Tarczyn", "operator": "", "stage": "Permit granted", "filing_date": "2025-04-14", "it_mw": null, "grid_mw": null, "backup_generators": 66, "thermal_mw": null, "engine_makes": "", "source_authority": "Regional Directorate for Environmental Protection (Poland)", "source_url": "https://www.gov.pl/attachment/2cb12c00-38dd-45cf-bcb2-e13529f092b6"}, {"id": "PL-MZ-LESZNO-KCPD", "country": "Poland", "municipality": "Leszno (obręb Leszno)", "operator": "", "stage": "Permit granted", "filing_date": "2025-04-14", "it_mw": null, "grid_mw": null, "backup_generators": 66, "thermal_mw": null, "engine_makes": "", "source_authority": "Regional Directorate for Environmental Protection (Poland)", "source_url": "https://www.gov.pl/attachment/8a044f89-a7f4-43a9-ac0b-81e535c229e8"}, {"id": "AT-NOE-LEOPOLDSDORF-CLOUDHQ", "country": "Austria", "municipality": "Leopoldsdorf", "operator": "CloudHQ", "stage": "EIA screening", "filing_date": "2026-08-27", "it_mw": null, "grid_mw": 200.0, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Landtag of Lower Austria", "source_url": "https://noe-landtag.gv.at/fileadmin/gegenstaende/20/10/1059/1059_Antrag.pdf"}, {"id": "AT-NOE-LEOPOLDSDORF-NDCGARBE", "country": "Austria", "municipality": "Leopoldsdorf", "operator": "NDC-Garbe", "stage": "Rezoning pending", "filing_date": "2026-08-27", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "Landtag of Lower Austria", "source_url": "https://noe-landtag.gv.at/fileadmin/gegenstaende/20/10/1059/1059_Antrag.pdf"}, {"id": "AT-OOE-KRONSTORF-GOOGLE", "country": "Austria", "municipality": "Kronstorf", "operator": "Google", "stage": "Other filing", "filing_date": "2026-05-11", "it_mw": null, "grid_mw": null, "backup_generators": null, "thermal_mw": null, "engine_makes": "", "source_authority": "www.land-oberoesterreich.gv.at", "source_url": "https://www.land-oberoesterreich.gv.at/Mediendateien/ALZ/web_2026010_ALZ_redaktionell.pdf"}]}