Free sample

Emissions permit granted (BImSchG)MTUMitsubishi

InterXion Real Estate XXII B.V. data centre in Frankfurt am Main, Germany

Latest document dated 28 Nov 2023, from UVP-Portal. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
64
MW of generator thermal input
459

The backup fleet in the filing

Each block is one generator set: 64 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Emissions permit granted (BImSchG)

    UVP-Portal. Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordDE-HE-FRANKFURT-INTERXION-DPF
Location
Frankfurt am Main (Fechenheim), Germany
Operator or project company
InterXion Real Estate XXII B.V.
Stage
Emissions permit granted (BImSchG)
Filing date
28 Nov 2023
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
64
Generator thermal input
459 MW
Engine makes named
MTU, Mitsubishi

Source: UVP-Portal. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.