Industrial-emissions licence application

Microsoft Operations Ireland Ltd data centre in Clondalkin, Ireland

Latest document dated 1 Mar 2023, from Environmental Protection Agency (Ireland). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
41
MW of generator thermal input
212.6

The backup fleet in the filing

Each block is one generator set: 41 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Industrial-emissions licence application

    Environmental Protection Agency (Ireland). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordIE-DUB-CLONDALKIN-MICROSOFT-DB3-5
Location
Clondalkin (Grange Castle South Business Park), Ireland
Operator or project company
Microsoft Operations Ireland Ltd
Stage
Industrial-emissions licence application
Filing date
1 Mar 2023
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
41
Generator thermal input
212.6 MW
Engine makes named
Not named in the filing

Source: Environmental Protection Agency (Ireland). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.