Free sample

Air-emissions permit application

PolarDC HER AS data centre in Porsgrunn, Norway

Latest document dated 16 Jan 2026, from Statsforvalteren. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
40

The backup fleet in the filing

Each block is one generator set: 40 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Air-emissions permit application

    Statsforvalteren. Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordNO-TELEMARK-PORSGRUNN-POLARDC-HER01
Location
Porsgrunn (Herøya), Norway
Operator or project company
PolarDC HER AS
Stage
Air-emissions permit application
Filing date
16 Jan 2026
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
40
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: Statsforvalteren. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.