backup generators
506
MW of IT load
495

The backup fleet in the filing

Each block stands for five generator sets: 506 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Final design compliance review

    siaia.apambiente.pt. Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordPT-SET-SINES-STARTCAMPUS-SINES40
Location
Sines (Zona Industrial e Logística de Sines), Portugal
Operator or project company
START – Sines Transatlantic Renewable & Technology Campus (Start Campus)
Stage
Final design compliance review
Filing date
13 Nov 2024
IT load
495 MW
Grid connection
Not stated in the filing
Backup generators
506
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: siaia.apambiente.pt. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.