Final design compliance review
START – Sines Transatlantic Renewable… data centre in Sines, Portugal
Latest document dated 13 Nov 2024, from siaia.apambiente.pt. Official document
- backup generators
- 506
- MW of IT load
- 495
The backup fleet in the filing
Timeline
Public documents for this project, and what our daily checks found.
- Final design compliance review
siaia.apambiente.pt. Official document
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordPT-SET-SINES-STARTCAMPUS-SINES40
- Location
- Sines (Zona Industrial e Logística de Sines), Portugal
- Operator or project company
- START – Sines Transatlantic Renewable & Technology Campus (Start Campus)
- Stage
- Final design compliance review
- Filing date
- 13 Nov 2024
- IT load
- 495 MW
- Grid connection
- Not stated in the filing
- Backup generators
- 506
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: siaia.apambiente.pt. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.