Rezoning pending
NDC-Garbe data centre in Leopoldsdorf, Austria
Latest document dated 27 Aug 2026, from Landtag of Lower Austria. Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Rezoning pending
Landtag of Lower Austria. Official document
- Official document online at our check
Checked every day since 9 Nov 2026.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordAT-NOE-LEOPOLDSDORF-NDCGARBE
- Location
- Leopoldsdorf, Austria
- Operator or project company
- NDC-Garbe
- Stage
- Rezoning pending
- Filing date
- 27 Aug 2026
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: Landtag of Lower Austria. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.