Other filing
Google data centre in Kronstorf, Austria
Latest document dated 11 May 2026, from www.land-oberoesterreich.gv.at. Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Other filing
www.land-oberoesterreich.gv.at. Official document
- Official document no longer online
Found offline at our check. The figures on this page come from it.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordAT-OOE-KRONSTORF-GOOGLE
- Location
- Kronstorf, Austria
- Operator or project company
- Stage
- Other filing
- Filing date
- 11 May 2026
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: www.land-oberoesterreich.gv.at. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.