Free sample

Environmental-authority opinion (MRAe)

Data-centre project in Rantigny, France

Latest document dated 16 Jul 2026, from Mission régionale d'autorité environnementale (MRAe). Official document

Location of the project in Europe. Grey dots: other projects in the index.
MW of IT load
480

The backup fleet in the filing

The filing does not state how many generator sets there are.

Timeline

Public documents for this project, and what our daily checks found.

  1. Scoping opinion

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  3. Official document online at our check

    Checked every day since 9 Nov 2026.

  4. Official document online at our check

    Checked every day since 9 Nov 2026.

  5. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-HDF-RANTIGNY-CAMPUS
Location
Rantigny, France
Operator or project company
Not named in the filing
Stage
Environmental-authority opinion (MRAe)
Filing date
16 Jul 2026
IT load
480 MW
Grid connection
300 MW
Backup generators
Not stated in the filing
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.