Environmental-authority opinion (MRAe)
Data-centre project in Bonneuil-sur-Marne / Sucy-en-Brie, France
Latest document dated 23 Apr 2025, from Mission régionale d'autorité environnementale (MRAe). Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Environmental-authority opinion (MRAe)
Mission régionale d'autorité environnementale (MRAe). Official document
- Official document online at our check
Checked every day since 9 Nov 2026.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
- Location
- Bonneuil-sur-Marne / Sucy-en-Brie, France
- Operator or project company
- Not named in the filing
- Stage
- Environmental-authority opinion (MRAe)
- Filing date
- 23 Apr 2025
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in France
- 114generatorsSNC Data Hills data centre in Aulnay-sous-Bois, FranceEnvironmental-authority opinion (MRAe), 12 Feb 2025
- 111generatorsMicrosoft 1985 Sàrl data centre in Petit-Landau / Hombourg, FranceEnvironmental-authority opinion (MRAe), 22 Jun 2026
- 74generatorsSAS PIPA-DC1 data centre in Blyes, FranceEnvironmental-authority opinion (MRAe), 13 Aug 2026
- 72generatorsInterxion France data centre in La Courneuve, FranceOther filing, 23 May 2025
- 69generatorsOVHcloud data centre in Gravelines, FranceEnvironmental-authority opinion (MRAe), 28 Oct 2025
- 62generatorsLCP FR DC1 data centre in Corbeil-Essonnes / Le Coudray-Montceaux, FranceEnvironmental-authority opinion (MRAe), 7 May 2025