backup generators
33
MW of grid connection
75

The backup fleet in the filing

Each block is one generator set: 33 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-LEBOURGET-SEGRO
Location
Le Bourget, France
Operator or project company
Segro Bourget
Stage
Environmental-authority opinion (MRAe)
Filing date
30 Jun 2025
IT load
Not stated in the filing
Grid connection
75 MW
Backup generators
33
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.