DATA 4 Services data centre in Marcoussis, France

Latest document dated 9 Aug 2023, from Mission régionale d'autorité environnementale (MRAe). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
48
MW of IT load
60

The backup fleet in the filing

Each block is one generator set: 48 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-MARCOUSSIS-DATA4-ZONE2NORD
Location
Marcoussis, France
Operator or project company
DATA 4 Services
Stage
Environmental-authority opinion (MRAe)
Filing date
9 Aug 2023
IT load
60 MW
Grid connection
100 MW
Backup generators
48
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.