Environmental-authority opinion (MRAe)

Bouygues Immobilier data centre in Meudon, France

Latest document dated 10 Jan 2019, from DRIEAT Île-de-France. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
24
MW of generator thermal input
132

The backup fleet in the filing

Each block is one generator set: 24 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    DRIEAT Île-de-France. Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-MEUDON-BOUYGUESIMMO-DC
Location
Meudon (Meudon-la-Forêt), France
Operator or project company
Bouygues Immobilier
Stage
Environmental-authority opinion (MRAe)
Filing date
10 Jan 2019
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
24
Generator thermal input
132 MW
Engine makes named
Not named in the filing

Source: DRIEAT Île-de-France. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.