Free sample

Environmental-authority opinion (MRAe)

Equinix Hyperscale 2 (PA15) SAS data centre in Meudon, France

Latest document dated 19 Nov 2025, from Mission régionale d'autorité environnementale (MRAe). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
33
MW of grid connection
80

The backup fleet in the filing

Each block is one generator set: 33 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-MEUDON-EQUINIX-PA15
Location
Meudon, France
Operator or project company
Equinix Hyperscale 2 (PA15) SAS
Stage
Environmental-authority opinion (MRAe)
Filing date
19 Nov 2025
IT load
Not stated in the filing
Grid connection
80 MW
Backup generators
33
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.