backup generators
17
MW of generator thermal input
49.5

The backup fleet in the filing

Each block is one generator set: 17 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Other filing

    Géorisques (French installations register). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-VITRY-OPCORE-DC3
Location
Vitry-sur-Seine, France
Operator or project company
OPCORE
Stage
Other filing
Filing date
12 Feb 2024
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
17
Generator thermal input
49.5 MW
Engine makes named
Not named in the filing

Source: Géorisques (French installations register). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.