Environmental permit application
Amazon Data Services UK Limited data centre in Iver, United Kingdom
Latest document dated 13 Aug 2026, from Environment Agency. Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Environmental permit application
Environment Agency. Official document
- Official document online at our check
Checked every day since 9 Nov 2026.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordGB-BKM-IVER-AMAZON-RIDGEWAY
- Location
- Iver (Ridgeway Trading Estate), United Kingdom
- Operator or project company
- Amazon Data Services UK Limited
- Stage
- Environmental permit application
- Filing date
- 13 Aug 2026
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: Environment Agency. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in United Kingdom
- 129generatorsAmazon Data Services UK Limited data centre in Didcot, United KingdomEnvironmental permit granted, 27 Jul 2026
- 89generatorsEquinix (UK) Limited data centre in Slough, United KingdomPermit variation granted, 29 Aug 2025
- 57generatorsVirtus Holdco Limited data centre in Saunderton, United KingdomEnvironmental permit application, 23 Apr 2026
- 56generatorsPDCG (Group Services) Limited data centre in London, United KingdomPermit variation granted, 20 May 2025
- 47generatorsVirtus Holdco Limited data centre in Slough, United KingdomPermit variation granted, 15 Apr 2026
- 46generatorsColt Data Centre Services UK Limited data centre in Hayes, United KingdomEnvironmental permit granted, 30 Jul 2025