Free sample

Grid concession granted

Tonstad Datapark AS data centre in Sirdal, Norway

Latest document dated 10 Dec 2025, from NVE (Norwegian Water Resources and Energy Directorate). Official document

Location of the project in Europe. Grey dots: other projects in the index.
MW of grid connection
300

The backup fleet in the filing

The filing does not state how many generator sets there are.

Timeline

Public documents for this project, and what our daily checks found.

  1. Grid concession granted

    NVE (Norwegian Water Resources and Energy Directorate). Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordNO-AGDER-SIRDAL-TONSTAD
Location
Sirdal (Tonstad), Norway
Operator or project company
Tonstad Datapark AS
Stage
Grid concession granted
Filing date
10 Dec 2025
IT load
Not stated in the filing
Grid connection
300 MW
Backup generators
Not stated in the filing
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: NVE (Norwegian Water Resources and Energy Directorate). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.