Free sample

Air-emissions permit application

Green Mountain AS / Green Mountain… data centre in Hamar, Norway

Latest document dated 14 Feb 2024, from NVE (Norwegian Water Resources and Energy Directorate). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
130
MW of IT load
90

The backup fleet in the filing

Each block stands for five generator sets: 130 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Air-emissions permit application

    NVE (Norwegian Water Resources and Energy Directorate). Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordNO-INNLANDET-HAMAR-GREENMOUNTAIN-HEGGVIN
Location
Hamar (Heggvin næringspark), Norway
Operator or project company
Green Mountain AS / Green Mountain Innlandet AS
Stage
Air-emissions permit application
Filing date
14 Feb 2024
IT load
90 MW
Grid connection
110 MW
Backup generators
130
Generator thermal input
Not stated in the filing
Engine makes named
Not named in the filing

Source: NVE (Norwegian Water Resources and Energy Directorate). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.