Grid concession granted
Tydal Data Center AS data centre in Tydal, Norway
Latest document dated 28 Mar 2025, from NVE (Norwegian Water Resources and Energy Directorate). Official document
- MW of grid connection
- 180
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Grid concession granted
NVE (Norwegian Water Resources and Energy Directorate). Official document
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordNO-TRONDELAG-TYDAL-TDC-FASE2
- Location
- Tydal (Stugudalsvegen), Norway
- Operator or project company
- Tydal Data Center AS
- Stage
- Grid concession granted
- Filing date
- 28 Mar 2025
- IT load
- Not stated in the filing
- Grid connection
- 180 MW
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: NVE (Norwegian Water Resources and Energy Directorate). Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Norway
- 53generatorsPolarDC DRA AS data centre in Drangedal, NorwayPollution permit granted, 14 Sep 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayGrid concession granted, 28 Jan 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayPollution permit granted, 25 Aug 2025
- 40generatorsPolarDC HER AS data centre in Porsgrunn, NorwayAir-emissions permit application, 16 Jan 2026
- 12generatorsGreen Mountain AS data centre in Tinn, NorwayAir-emissions permit application, 12 Dec 2025
- 10generatorsGreen Mountain AS data centre in Stavanger, NorwayPollution permit granted, 31 Mar 2026