Environmental permit granted

Equinix (Sweden) AB data centre in Stockholm, Sweden

Latest document dated 8 Jun 2023, from Naturvårdsverket. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
16
MW of generator thermal input
88.3

The backup fleet in the filing

Each block is one generator set: 16 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental permit granted

    Naturvårdsverket. Official document

  2. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordSE-AB-STOCKHOLM-EQUINIX-SK2
Location
Stockholm (Förbrännaren 10), Sweden
Operator or project company
Equinix (Sweden) AB
Stage
Environmental permit granted
Filing date
8 Jun 2023
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
16
Generator thermal input
88.3 MW
Engine makes named
Not named in the filing

Source: Naturvårdsverket. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.