Environmental permit granted
EcoDC Östersund AB data centre in Östersund, Sweden
Latest document dated 23 Jun 2025, from Mark- och miljödomstolen. Official document
- backup generators
- 40
- MW of generator thermal input
- 350
- MW of grid connection
- 150
The backup fleet in the filing
Timeline
Public documents for this project, and what our daily checks found.
- Environmental permit granted
Mark- och miljödomstolen. Official document
- Official document no longer online
Found offline at our check. The figures on this page come from it.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordSE-Z-OSTERSUND-ECODC
- Location
- Östersund (Massaveden 4), Sweden
- Operator or project company
- EcoDC Östersund AB
- Stage
- Environmental permit granted
- Filing date
- 23 Jun 2025
- IT load
- Not stated in the filing
- Grid connection
- 150 MW
- Backup generators
- 40
- Generator thermal input
- 350 MW
- Engine makes named
- Not named in the filing
Source: Mark- och miljödomstolen. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Sweden
- 280generatorsEcoDC 2 AB (EcoDataCenter) data centre in Borlänge, SwedenEnvironmental permit granted, 12 May 2026
- 145generatorsatNorth AB data centre in Sollefteå, SwedenPre-application consultation, 16 Jun 2026
- 12generatorsatNorth AB data centre in Stockholm, SwedenPre-application consultation, 14 Jan 2026
- —generatorsDigital Realty AB data centre in Stockholm, SwedenEnvironmental permit application, 26 Nov 2025
- 20generatorsSI STO 01.2 AB data centre in Upplands Väsby, SwedenEnvironmental permit granted, 11 May 2023
- 16generatorsEquinix (Sweden) AB data centre in Stockholm, SwedenEnvironmental permit granted, 8 Jun 2023